Committed water filtration system developing and producing since 2002
TEL:+86-731-84391122
Email:info@cncdfs.com
As a supporting project of the Beijing Olympic Games, the momentum of terminal 3 is reflected in the whole building group, which is 3 li long and 790 meters wide. It is integrated by a "complete" roof, forming a dynamic architectural volume.
Known as the "three bright spots", the MRT system, pre-station traffic and rapid baggage transfer system will bring convenience and efficiency to passengers.
The MRT system will be connected to the ticketing hall and the international departure area, with a 2.1-mile journey taking just two minutes and a "free" ride.
Terminal 3, with a total investment of about 25 billion yuan, will be completed by the end of 2007 to ensure normal operation before the 2008 Olympic Games.
It will achieve three goals: to achieve hub airport functions, meet the needs of the Olympics, and create a new image of the capital airport.
Depending on its design size, the new terminal could handle 31-35 million passengers a year by 2015, while the expanded capital airport could handle 60 million passengers a year.
Duoling products appear in the capital airport, through the fierce competition, our company's self-cleaning filter successfully won the bid for the capital airport expansion project terminal 3 project, domestic water treatment equipment shake hands with the international airport, which means that the foreign brand exclusive international airport water treatment equipment situation will be changed.
It proves that the quality and brand of our products have been recognized again. Duoling has developed and produced self-cleaning filters for the cooling and circulating water system of terminal 3. After a long time of operation, the product has been highly reliable and stable.